Asbestos Removal in Compton

At Compton Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Cream stucco one-story house with a gabled entry porch, a shingle roof, a small lawn and a rust-colored wrought-iron fence in warm evening light.
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Stairway in a house with small tan patches on the ceiling and wall and white sample bags resting on the steps and the floor.Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and a window onto trees, and a doorway at the right.

Asbestos testing and surveys

Testing starts with a Cal/OSHA-certified consultant or technician collecting the samples. A lab analyzes them, and the survey you get back ties each result to a place in the building. That is what you need in hand before a remodel or teardown begins.

Popcorn ceiling removal

Textured ceilings are sampled before anyone scrapes, sands or paints them. If the lab finds asbestos, the texture comes down as asbestos work. If it finds none, the job is ordinary ceiling work.

Kitchen with cream cabinets and a white range, a patterned floor covering and a gray flap lifted at its left edge.Room wall cut open around an electrical panel, with clear plastic taped to the wall around the opening and spread over the floor.

Floor tile and mastic removal

Tile, sheet vinyl and the adhesive beneath them are sampled together, and so is anything laid over them, such as carpet or newer flooring. Rule 1403 asks the survey to go through every flooring layer to the joist before a floor comes up.

Drywall, joint compound and plaster removal

Plaster, joint compound and wall texture are each sampled where a wall will be cut, opened or removed, with the wall or ceiling cavity covered as necessary. Older plaster walls and newer drywall go through the same sampling steps.

Attic with plank flooring and round silver-gray ducts along the rafters, loose insulation at the sides and a small window at the far end.Empty room with clear plastic sheeting over the walls and windows, a wood floor and a blue-gray portable air machine with a flexible hose.

HVAC duct and pipe insulation removal

Ducts and pipes with insulation get sampled before heating or cooling equipment is changed. Under Rule 1403 that equipment change is renovation, so the survey happens ahead of the equipment crew, and positives are dealt with before the new system goes in.

Renovation and demolition abatement

Remodels and teardowns start with the survey. A demolition also needs the Rule 1403 notice, filed online, and the demolition permit application carries a copy of it. We remove what tested positive before the remodel or demolition crew begins.

Asbestos testing and removal costs

Nearly 8 in every 10 Compton homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Compton, East Rancho Dominguez and Bell Gardens. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

Sampling by a Cal/OSHA-certified consultant or technician, an accredited lab reading of each sample and one written report. The air test after removal is run by an independent consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The room covered in plastic with air filters running, the texture soaked and scraped into bags, a final cleanup and the haul. Skim coating, new texture and paint are extra.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The work area sealed, tile or sheet vinyl lifted, the black mastic beneath removed where it tested positive, bags hauled out and the room cleaned. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment and air filters, the wall or ceiling material that tested positive removed wet, bagged and hauled, then a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, closet or pipe run, positive wrap or tape removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The positive materials come out before the remodel or demolition crew begins, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra, and roofing is priced after a roof visit.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Houses from the 1940s and 1950s

Half of Compton’s homes were built in or before 1957. Nearly 8 in every 10 date from before 1980, and about 3 in every 10 from before 1950. The 1950s added about 7,100 homes and the 1940s about 5,200.

Compton’s housing includes 73.8 percent one-unit homes and 11.7 percent in buildings of five or more units, with renters in 43.6 percent of households. The rule treats single-unit dwellings differently from apartments, townhouses and condominiums, so the mix shapes which provisions can apply.

The survey rule sets no cutoff by build year, so the age of a house does not decide whether the rule applies. A house from the 1990s is treated like one from the 1940s.

What state law asks at the demolition counter

Before a demolition permit is issued, someone has to show the building department the district notice. That is state law, as the South Coast Air Quality Management District describes Health and Safety Code 19827.5, and the applicant is the one who hands over the copy.

That notification goes to the district ahead of the work. Every demolition needs one, and the district’s rule asks for the survey prior to any demolition or renovation, apart from a single-unit house renovation under 100 square feet. A renovation that removes less than 100 square feet of surface area of asbestos-containing material has its own exemption from the notice.

Compton is one of the cities on the district’s list. The building department can add steps of its own for your address, and the district’s Asbestos Hot Line at (909) 396-2336 can answer questions about the rule, so check with both before you apply.

Floors, walls and the kitchen

Samples come from beneath the surface. Under the rule, the survey covers every layer of flooring down to the joist and extends into wall and ceiling cavities as necessary, which is why the sampling plan is settled before a remodel begins.

A kitchen remodel can reach the floor, the walls and the ceiling in one job, so the samples are planned across all three. Tell us which rooms the remodel will open and we will plan the samples around them.

Which floor coverings does Rule 1403 treat as resilient? Asbestos-containing floor tile, asphalt and vinyl alike, and sheet vinyl above one percent asbestos. Carpet or a new floor laid on top leaves the older layer in the survey.

Can an owner do the work? The district’s answer

Rule 1403 carves out an owner-occupant of a residential single-unit dwelling who personally conducts a renovation activity at the home. South Coast AQMD advises against it, pointing to potential asbestos exposure and cross-contamination, so treat the provision as a legal fact, not a recommendation.

To qualify, the owner must live in the house, the house cannot be vacant, and the owner must do the renovation personally, not laborers, friends or family. A landlord does not live in the rented house, so rentals fall outside it, along with condominiums, townhouses, apartments and demolition.

Bags set outside the house stay under Rule 1403’s handling, storage and disposal requirements until the waste leaves. Please do not take samples yourself. Call us and we will arrange the survey, the notice and the removal.

Our process

01

Survey and samples

We start with the survey. A Cal/OSHA-certified consultant or technician takes samples of the materials your job will touch, and a lab reports what is in them. We quote from those results.

02

District notice and setup

When a job needs the Rule 1403 notice, we file it online no later than 10 working days before the work starts, along with the notification fee. We set up the work area before removal begins.

03

Removal, air testing and waste

After removal of the positives, friable asbestos waste goes out as California hazardous waste, with a licensed hauler and a manifest. The clearance air test that closes the job belongs to an independent consultant, because California keeps it away from the removal contractor.

Serving Compton, Bell Gardens and East Rancho Dominguez

We also serve Bell Gardens and East Rancho Dominguez. Call us for confirmation if your address is outside the area.

Frequently asked questions

Do I need a survey before a small remodel?

It depends on the job. A teardown of any house needs the survey, however small. A renovation of a residential single-unit dwelling is exempt when the work removes or strips less than 100 square feet of asbestos-containing material, counted by surface area. Apartments, townhouses and condominiums are outside that exemption, and the lab results give you the amount.

Does a small job need the district notice?

The notice exemption follows the amount removed. When a renovation takes out less than 100 square feet of surface area of asbestos-containing material, no notice is needed, and the building can be a house, an apartment building or a shop. A teardown never qualifies, and a small job still follows the rule’s work practices and waste handling.

What goes into the price?

The amount of material and the ease of reaching it do most of the work in setting a price. We begin with lab results and quote from them. A job that needs the notice adds the district notification fee. The call and the quote cost nothing.

How do I check a contractor?

Before you sign, find the contractor’s CSLB license number and have it on your written contract. The license should show C-22 or ASB, because for asbestos-related work involving 100 square feet or more of asbestos-containing material the Contractors State License Board requires a C-22 Asbestos Abatement classification, unless the license qualifier has passed the asbestos certification exam. Do this before the job is scheduled.

Who tests the air after removal?

The consultant who takes the air samples after removal is independent of the removal crew. California law bars contractors from clearance air monitoring, so we do not take that test. Ask on the call how the consultant fits your schedule.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 373-5209

Call (424) 373-5209