Popcorn Ceiling Removal in Compton

Typical cost in Compton

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

Textured ceilings are sampled before anyone scrapes, sands or paints them. If the lab finds asbestos, the texture comes down as asbestos work, and if it finds none, it is ordinary ceiling work.

Hold off on scraping, sanding or scrubbing the ceiling until a sample is back, and please do not take that sample yourself. A Cal/OSHA-certified consultant or technician collects it, and we pick up the notice and the removal after that.

Request a free quote
Empty living room with a textured popcorn ceiling, beige carpet, a sliding glass door and a window onto trees, and a doorway at the right.

Ceiling jobs we handle

One room or a whole house

A one-room ceiling and a whole-house ceiling start the same way, with a sample. The surface area removed then decides whether the South Coast Air Quality Management District’s small-job exemption from the notice applies.

Painted or stained ceilings

A painted ceiling, or one with a water stain, is sampled like any other. Tell us on the call what the stain looks like and where it is, and the survey will cover that area.

Ceilings in a bigger remodel

Taking out a bearing wall counts as demolition under the district’s rule, so the survey and notice come first. Ceiling work that goes with a kitchen or addition runs on the same survey as the rest of that job.

After the texture is down

Once the texture is off, the air check afterward belongs to an outside consultant. State law keeps clearance air monitoring away from contractors, so our removal crew leaves that test to someone else.

The rules behind a ceiling job

A ceiling job brings the district notice and the crew you hire into play once the survey is done.

The notice and the small-job line

We file the ceiling job’s notice online, and it reaches the district no later than 10 working days before the work starts. Renovations removing less than 100 square feet of surface area of asbestos-containing material are exempt from that notice. A demolition does not get the exemption.

Hiring the crew

Registration is the employer’s duty, not yours. Cal/OSHA wants it in place before any work involving 100 square feet or more of surface area of asbestos-containing material starts, so with a large ceiling it is fair to ask any crew you are considering whether it is registered.

Bedroom with a textured ceiling that has a brown water stain in one corner, beige carpet and a large window.

Floors are covered under floor tile and mastic removal; the home page lists more.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 373-5209

Call (424) 373-5209