Renovation and Demolition Abatement in Compton

Typical cost in Compton

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+

Remodels and teardowns start with the survey. A demolition also needs a notice to the South Coast Air Quality Management District, and we remove the material that tested positive before the remodel or demolition crew begins.

A bearing wall coming out counts as demolition under the district’s rule. Plan the survey before the permit application, because the application asks for the notice.

Request a free quote
Empty room with clear plastic sheeting over the walls and windows, a wood floor and a blue-gray portable air machine with a flexible hose.

Jobs we prepare for

Kitchens and baths

Taking out cabinets, lifting a floor and opening a wall can all happen in one kitchen or bath remodel, so samples come from each of those places first. Whatever tested positive is removed before the remodel crew arrives.

Bearing walls

Taking out a wall that holds up the roof or a floor above is demolition as the rule defines it, which covers the wrecking or removal of any load-supporting structural member. Plan for the survey and the notice whenever the plans show a bearing wall coming out.

Whole-house teardowns

Teardowns of small houses get no discount on the rules. The survey and the district notice come first, and the exemptions for small jobs in the rule were written for renovation, never demolition.

Garages and rear buildings

The rule defines a facility broadly, to include any residential structure or building. That is why taking down a detached garage or a rear building is handled with the same demolition steps as a house.

Demolition and the permit application

A teardown puts the air district and the local building department in the same job, with the notice linking the two.

The notice and the copy

Health and Safety Code 19827.5, as the district describes it, has the demolition permit applicant hand the local building department a copy of the notice that was filed with the district. That notice must reach the district no later than 10 working days before any demolition or any renovation that removes 100 square feet or more of asbestos-containing material, and the abatement contractor submits it online along with the notification fee.

The survey comes first

A demolition always needs the survey, however small the house. The survey exemption and the notice exemption both belong to renovation, and neither reaches a teardown.

Clearance air testing

Clearance air monitoring after removal is not something we perform. California bars contractors from it, so an independent consultant collects those samples after the work.

Bathroom opened to the framing around the tub, with floor tile lifted in places, teal and pink wall tile on one side and plastic hung at the left.

Everything starts with asbestos testing; the home page lists every service.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 373-5209

Call (424) 373-5209